Meridian Technology Infrastructure - Cost Transparency: Executive Summary

Prepared for: CFO / Head of Technology Infrastructure Period: Q1 2025 · Total infrastructure cost: $40.2M

The headline

For the first time, Meridian’s $40.2M infrastructure run-rate has been fully attributed from the General Ledger down to the products, applications, and programs that consume it. The cost base is highly concentrated, which is good news: managing a small number of large items moves the number.

What drives the cost

Budget picture

In total, actual spend lands within about 1% of budget, but that near-match hides large offsetting movements. Compute and Database are consistently and increasingly under budget (Compute by 10% rising to 21% across the quarter), which points to over-provisioning or work running behind plan. The opportunity is a reforecast that releases or redeploys the unused budget on the largest product line.

One caveat to read correctly: End-User and Security appear enormously over budget. This is not real overspend. It reflects how shared labour is attributed to headcount-heavy products against budgets that were set at token levels. The action is to reset those budgets, not to cut those teams.

Scenario findings

Risks and opportunities

Recommendation

Cloud migration is a bet, not a saving. Its impact ranges from about +$50k to +$555k, driven by the true per-unit cloud rate and how much fixed data-centre cost can actually be shed. Because the data centre (CP04) is a fixed cost pool, little sheds in the short term, which pushes the likely outcome toward the high end. Prove both numbers before committing a dollar. In parallel, act on the two certainties: reforecast the under-spending Compute and Database lines to release budget, and open the vendor conversation now to blunt the certain +$204k increase. Focus management attention on Compute, since at half the cost base it is where transparency creates the most value.